Post-Construction Cleanup
Professional post-construction cleaning in NYC
When the contractors leave, the dust stays. We remove debris, fine dust and residue so your new or renovated space is ready for inspection, move-in or opening day.
- Same team
- every visit, trained on your space
- No contract
- month to month, always
- Free walkthrough
- before every quote
- 7 days a week
- 7 AM to 11 PM
Post-Construction Cleaning in NYC
Construction dust gets everywhere: inside vents, on top of door frames, in window tracks and on every new surface. A standard cleaning crew will move it around. Post-construction cleaning removes it.
We work in phases that match the end of a build, coordinate with your contractor or project manager, and finish with a detailed clean so the space looks the way it did in the renderings.
Every trace of construction dust removed before handover
Debris & dust
- Leftover debris removed
- HEPA vacuuming of all surfaces
- High dusting of ledges and fixtures
- Vents and returns wiped
Surfaces & fixtures
- Cabinets inside and out
- Counters, sinks and appliances
- Light fixtures and switches
- Doors, frames and hardware
Glass & windows
- Interior windows and frames
- Window tracks and sills
- Glass partitions
- Mirrors
Floors & finish
- Paint and adhesive residue removed
- Hard floors cleaned
- Carpets vacuumed
- Final touch-up walkthrough
A space that passes inspection and looks like the renderings
Cleaning in phases
A rough clean after major work, a final clean before handover, and a touch-up right before move-in or opening.
Fine dust, not just debris
HEPA vacuums and microfiber trap the fine dust that otherwise resettles on every surface for weeks.
Coordinated with your contractor
We schedule around trades and punch-list work so the clean happens at the right moment.
Cleaning in phases that match the end of your build
- Rough clean
- Debris and heavy dust after major construction.
- Final clean
- Detailed clean before handover or inspection.
- Touch-up
- Last pass right before move-in or opening.
- Ongoing
- Roll straight into a regular cleaning plan.
On your site walkthrough, we look at
The walkthrough is free. It is how your quote ends up matching your space.
- What stage the project is at and which trades are still on site
- Finishes that need special care: stone, glass, new wood
- How much fine dust is in vents and on ledges
- Window count and frame types
- Where debris and packaging should go
- Your inspection, handover or opening date
What our work looks like up close
Scroll for more →






Questions contractors and owners ask us
When should we schedule the post-construction clean?
Once major work is done and trades are mostly out. We can do a rough clean first and a final clean right before handover.
Do you remove construction debris?
We remove leftover small debris and packaging. Large construction waste should be hauled by your contractor.
Can you move into a regular cleaning plan afterward?
Yes. Many clients roll straight from a post-construction clean into regular service.
Can you clean while the contractor finishes punch-list items?
Yes. We plan around the remaining trades and come back for a final touch-up once they are done.
Do you clean windows after construction?
Yes. Interior glass, frames, sills and tracks are part of the scope, including stickers and residue.
Post-construction cleaning where the city is building
Get your space move-in ready for opening day
Tell us the square footage, the finishes, and your handover or opening date.
Helpful to include
- Square footage and floors
- Finishes (stone, glass, wood, carpet)
- Handover, inspection or opening date
- Whether trades will still be on site
Prefer to talk? Call (646) 389-4412, seven days a week from 7 AM to 11 PM.


